April 2nd Electrical equipment preparation document
Numerous people have suggested that any electrical equipment either be on a surge suppressor or unplugged to prevent a power surge when the power is reconnected. Computer equipment will be off and the power either unplugged or turned off at the surge suppressor.
John will issue a command to shutdown all linux machines at 5:40pm. All other machines will be turned off by hand, so having your machine already off is helpful.
Instructions to faculty/staff
It would be helpful if faculty and staff would turn off their own equipment. When you turn off your own equipment, please add a post-it to your office door that marks your machine as already turned off. Something like:
- Comp off - your initials
If you don't have an office door, post a postit on your monitor instead.
Instructions to graduate students
We'll make sure the computer in your office is turned off. Computers staff need to check to see if linux machines are on a surge suppressor or plugged directly into the wall. If they are directly plugged, they should be unplugged. If they are on a surge suppressor, staff will make sure they are turned off.
Things we'll start turning off at ?:??: (need to establish a timeline)
9th floor:
- projector in 901
- 9th floor kitchen:
- refridgerator
- 3 microwaves
- 1 coffee machine
8th floor
- 8th floor copier
- computers in each office
7th floor
- 7th floor copier
- computers in each office
6th floor
- 6th floor copier
- computers in each office
5th floor
- 5th floor copier
- computers in each office
- All equipment in 507.
4th floor
- 4th floor copier
- computers in each office
3rd floor
- 3rd floor copier
- computers in each office
2nd floor
- copier in 205
- copier in 215
- computers in each office
- printers at each desk
- fax machine in main office
- credit card machine
- wisccard machine
- refridgerator in breakroom
- microwave in breakroom
1st floor
- Screen for digital display
- raspberry pi behind digital display
- computers in 101/101b
B1
- B127 office computers/printers
- B107 computers
- B107 projector
- B107 printer
- B102 podium (make sure it is powered off, don't unplug)
- B130 podium (make sure it is powered off, don't unplug)
B2
- B2 library computers and printers (talk to Travis)
- B205 computers and printers (talk to Jack Carson)
- B223 podium (make sure it is powered off, don't unplug)
- B231 podium (make sure it is powered off, don't unplug)
- B239 podium (make sure it is powered off, don't unplug)
Server shutdown/startup discussion
[[1]] Need access to this document? Email Sara.
Non-Server Startup
- Power up copiers on each floor, 3-8
- Power up copiers in 215, 205
- plug in 901 projector
- Check refridgerator on 9th floor
- Check refridgerator on 2nd floor
- plug in B107 projector
- Restart Gluster/Condor computers (get list)
Rest of computers will not be restarted until 4/3 or when their owner returns for use.